Strata Check-In
This is a demo of what a building manager sees. It is the real screen with an invented building on it. Every name, mobile number, time and key below is made up, nothing here can be changed, and no login is needed. The contractor's side is a separate 30 second demo.
Active

Riverbend Apartments

Example Street, Gold Coast QLD. Paid until 14 June 2027.

On site right now

3 people are signed in and have not signed out.

If the building is evacuated, this is the screen to open. It shows who signed in and has not signed out, how long they have been in, where they said they were headed, and their number to ring, in the largest type in the product because it is read on a phone outdoors.

Open the on site screen

It is not a roll call and Strata Check-In is not a fire safety system. Somebody who walked past the sign without scanning it is not on the list, and the screen says so on its face.

Email me as each contractor signs in. On. Each one is emailed to you as it happens.
Email me as each contractor signs out. Off. Switch it on to get an email as each contractor signs out.

Who came in

Every contractor who signed in, when they arrived and when they left.

Riverbend Apartments
Mon 2 November to Sun 8 November 2026
7 visits
ContractorInOutOn site
Riverbend PlumbingDean Marsh · 0412 000 000Mon 07:42Mon 09:151h 33m
Parkview ElectricalSam Whitfield · 0414 000 000Mon 10:05Mon 10:4843m
Coastal Lift ServicesAmrit Kaur · 0413 000 000Tue 08:20Tue 12:364h 16m
Harbour CleaningRosa Silva · 0416 000 000Wed 06:55Wed 07:4045m
Riverbend PlumbingDean Marsh · 0412 000 000Wed 13:12Closed automatically—
Harbour Fire ServicesNina Kostas · 0415 000 000Thu 09:30Thu 11:021h 32m
Harbour CleaningRosa Silva · 0416 000 000Fri 07:15Still on site—
7 visits · 5 contractors · 1 closed automatically

Closed automatically means the contractor did not sign out, so the visit was closed at the end of the day. The time they left is not known. On a real building this report also downloads as a spreadsheet, and you can pick any date range in the last 90 days.

Key register. On. Keys and fobs you have issued to contractors, and who holds them.

Keys out

Every key and fob this building has issued and not had back. Any that are past the date they were due back come first, then the rest, longest out first.

KeyHeld byOut sinceDue back
Master Key A
Lift motor room
Coastal Lift Services
Amrit Kaur · 0413 000 000
Reported lost, replacement cut
23 daysoverdue 9 days
Fob 12
Common areas and bin room
Harbour Cleaning
Rosa Silva · 0416 000 000
5 monthsongoing
Gate Remote 3Harbour Fire Services
Nina Kostas · 0415 000 000
todaydue back 28 Nov 2026
A key that is still out is never deleted, however long it has been out, because a register that forgot who held a key would be no use to you. It is deleted 90 days after you mark it returned, the same as a visit. A lost key is a note, not a different state. It is still out, because it is. Due back is optional. Set it when you agree a date at the handover, and a key past that date is marked overdue and sorts to the top, here and in the Monday report. Leave it blank for an ongoing job.

Handover pack

One page to print or save as a PDF: every key and fob still out and who is holding it, then every visit still on the system. For when the building changes hands, or when a committee asks.

Where they are headed

A list you write once. Contractors pick one when they sign in, one tap, and it shows on the on site screen and in your Monday report.

Should any of these also ask for a unit or lot number?

Tick one and a contractor who picks it gets a second box for the number. Leave them all unticked, which is how most buildings run it, and no unit number is ever recorded.

Who gets the Monday report

It goes to manager@example.com every Monday morning. You can send it to up to two more people, which is usually the chairperson and your strata manager.

The report carries contractor names and mobile numbers, so anybody you add can see them. It is your building's record to share, and this is you choosing to share it.

A note on the sign-in screen

One line, shown to every contractor who scans the code, until you clear it.

It collects nothing. It is the one thing here that only goes out, never in.

Signage

Print it and put it where contractors walk in. The code never changes, so you can print it again any time.

A4 noticeboardFor a noticeboard or a lobby wall.
A5 doorFor a door, at eye height.
Gate labelFor a gate, a meter box or a plant room.
Your weekly report arrives by email every Monday. Keep those emails. Visits are deleted from here after 90 days, so the emails are your building's permanent copy.

Something not working?

Tell me what happened and I will look at it. This goes straight to me, not to a help desk, and I reply to the email address on your login.

Sent with this: your name and email, this building, the screen you are on, your browser, and the version running. Nothing else. You do not have to work out which browser you are on or which screen broke, because it goes with the message.

That is the whole manager's side. Who is on site right now, a report for any date range, the signage to print, and the key register, the handover pack and the rest if you want them. Everything on this page is included: $39 a month per building, billed yearly, whatever the building's size. Set up your building or read the questions.
This is a demo. Every building, contractor and key on it is invented. Questions, email hello@stratacheckin.com.au or ring 0459 180 897. Set up your building